ASCO constructed this $3.5M sewage pumping station in Oshawa to support a growing residential development. Construction began in December 2004, and the facility was fully operational by January 2006.
The station includes a 40-foot-deep reinforced concrete wet well with raft slab, walls, and suspended slab construction. It is equipped with channel grinders and three 8-inch wastewater pumps capable of delivering over 35 million litres per day.
The facility also includes a standby generator, flow metering systems, and odour control. Meeting the required in-service date was critical to support downstream development, and ASCO successfully delivered the project on schedule.