Halton Hills Zone 5 Reservoir
ASCO constructed this 20,000 megalitre water storage reservoir to support peak domestic demand and fire protection for the Towns of Milton and Halton Hills. The project included a two-cell reinforced concrete in-ground reservoir, a valve house, and an access building with stairways into each chamber. Approximately 800 metres of 900 mm diameter feeder main was […]
Read MoreGeorgetown Digester Facility
ASCO completed the expansion and upgrade of the Georgetown Anaerobic Digestion Facility, increasing its capacity to 22,700 m³/day. This project supports continued residential and industrial growth while improving overall plant performance and reliability. The work included construction of a new 20-metre diameter reinforced concrete digester, complete with a steel floating gas holder cover and hydraulic […]
Read MoreColin Road Pumping Station
ASCO constructed this $3.5M sewage pumping station in Oshawa to support a growing residential development. Construction began in December 2004, and the facility was fully operational by January 2006. The station includes a 40-foot-deep reinforced concrete wet well with raft slab, walls, and suspended slab construction. It is equipped with channel grinders and three 8-inch […]
Read MoreChute-a-Blondeau Wastewater Treatment Plant
This project involved the construction of a new wastewater treatment plant designed to support the community’s long-term infrastructure needs. The scope included the full supply and installation of a sequencing batch reactor system, complete with all required process equipment and instrumentation. ASCO also delivered a new electrical and control building, along with influent and effluent […]
Read MoreBritannia Water Purification Plant: Retrofit to Plate Settlers, Settling Basin #4 & #5
ASCO completed the retrofit of Plate Settlers in Settling Basins 4 and 5 at the Britannia Water Purification Plant for the City of Ottawa. Delivered under a lump sum contract, the project was executed within a fully operational water treatment facility, requiring detailed planning and close coordination with City operations to maintain continuous drinking water […]