Loading ...

Loading ...

Loading ...

Loading ...

Loading ...
Loading ...
Placeholder Image
Loading ...
  •  
   
    1. http://ascoconstruction.com/index.php?option=com_mmportfolio&ctrl=image&view=small&c=3&i=15&ii=111" Untitled --
    2. http://ascoconstruction.com/index.php?option=com_mmportfolio&ctrl=image&view=small&c=3&i=15&ii=112" Untitled --
    3. http://ascoconstruction.com/index.php?option=com_mmportfolio&ctrl=image&view=small&c=3&i=15&ii=113" Untitled --
    4. http://ascoconstruction.com/index.php?option=com_mmportfolio&ctrl=image&view=small&c=3&i=15&ii=114" Untitled --
    5. http://ascoconstruction.com/index.php?option=com_mmportfolio&ctrl=image&view=small&c=3&i=15&ii=115" Untitled --
    6. http://ascoconstruction.com/index.php?option=com_mmportfolio&ctrl=image&view=small&c=3&i=15&ii=116" Untitled --

    Oro Medonte Biosolids Storage

    Client:  The City of Barrie
    Consultant:  CH2M Hill
    Value:  $16,126,000
    Completion:  December 2010

    The work generally consists of an expansion of the Biosolids Facility from its present capacity to accommodate the expansion of the Barrie Water Pollution Control Centre from 57.1 MLD to 76 MLD.

    This work includes the expansion and modifications to existing equipment, piping and structures plus the following new process units being added;

    • Cast-in-place concrete Biosolids storage tanks – One rectangular Storage tank and three rectangular Decant Cells with a total liquid capacity of 15,000,000 litres.
    •  New Pipe Gallery and Offices
    • Three sludge/supernatant transfer pumps
    • Sludge Mixing System
    • Truck Loading and Unloading System
    • Sludge Valve Chamber
    • Washwater System
    • Tipping trough tank flushing system in three decant cells

    The work required to accomplish these additions and modifications consist of civil, structural, architectural, mechanical, electrical, and instrumentation and controls.

    ASCO Construction Ltd. was pre-qualified to bid on this Project.

    Printable document

    View Project Details
    1. http://ascoconstruction.com/index.php?option=com_mmportfolio&ctrl=image&view=small&c=3&i=21&ii=117" Untitled --
    2. http://ascoconstruction.com/index.php?option=com_mmportfolio&ctrl=image&view=small&c=3&i=21&ii=118" Untitled --
    3. http://ascoconstruction.com/index.php?option=com_mmportfolio&ctrl=image&view=small&c=3&i=21&ii=119" Untitled --

    Hanlan Pumping Station

    Client: Region of Peel
    Consultant: Clean Water Engineering Company Ltd
    Value: $4,493,000
    Completed: 2004

    UNDER CONSTRUCTION

    View Project Details
    1. http://ascoconstruction.com/index.php?option=com_mmportfolio&ctrl=image&view=small&c=3&i=22&ii=80" Untitled --
    2. http://ascoconstruction.com/index.php?option=com_mmportfolio&ctrl=image&view=small&c=3&i=22&ii=81" Untitled --
    3. http://ascoconstruction.com/index.php?option=com_mmportfolio&ctrl=image&view=small&c=3&i=22&ii=82" Untitled --
    4. http://ascoconstruction.com/index.php?option=com_mmportfolio&ctrl=image&view=small&c=3&i=22&ii=83" Untitled --
    5. http://ascoconstruction.com/index.php?option=com_mmportfolio&ctrl=image&view=small&c=3&i=22&ii=84" Untitled --

    Colin Road Pumping Station

    Client:  Regional Municipality of Durham
    Consultant:  Marshall Macklin Managhan
    Value:  $3,500,000
    Completed:  January 2006

    Located in the City of Oshawa, construction of this new $3,500,000 sewage pumping station commenced in December of 2004.  The plant was put into service in January 2006 to accommodate a nearby expanded residential development that relies on this facility to receive the sewage flows and then pump it further downstream to the Durham Region Sewage Treatment Plant.

    The Pumphouse itself contains a standby generator, flow meters and odour control system and is positioned overtop of a 40’ deep ‘Wet Well’ consisting of a reinforced concrete raft slab, walls and suspended slab with channel grinders and outfitted with 3,8” wastewater pumps capable of collectively delivering over 35 million liters of sewage per day. 

    The completion date was critical to the client and was successfully achieved by ASCO. 

    Printable document  

    View Project Details
    1. http://ascoconstruction.com/index.php?option=com_mmportfolio&ctrl=image&view=small&c=3&i=19&ii=77" Untitled --
    2. http://ascoconstruction.com/index.php?option=com_mmportfolio&ctrl=image&view=small&c=3&i=19&ii=79" Untitled --

    Embrun Reservoir

    Client:  Township of Russell
    Consultant:  Stantec Consulting
    Value:  $3,077,000
    Completed:  2005

    The Embrun reservoir, an above-ground concrete water reservoir structure, was designed by Stantec Consulting and awarded to ASCO as a competitive lump-sum tender.  The ground condition of this site necessitated steel pile foundations supporting a structural slab-on-grade.

    The project was constructed on schedule successfully and incorporated two large structural concrete water storage tanks with two wet wells with the capacity of 1,410 cubic meters of water to meet the demands of the Township of Russell expansion requirements for the next 20 years of development. 

    The project included an attached control building and administration offices, a booster pump and telemetry system, and site work. As with these types of projects, mechanical, electrical, and controls systems play an important and technically challenging component of the project.  The project was completed smoothly and to the customers and consultants complete satisfaction. 